- Home
- Government
- Departments
- Engineering Division
- Stormwater Management
- City Stormwater Projects
City Stormwater Projects
2014 Stormwater Improvements
- City-wide Catch Basin Repair Program - Repaired deteriorating catch basins throughout the city.
- Enterprise Detention Basin - Included storm culvert removal and replacement and grading for storm water detention / flood plain creation.
- SR 91 / Creekside Intersection - Included additional improvements to drainage south of intersection to elevate road flooding during rain events.
- Mallard Cove to Glenwood Drive - Performed maintenance on drainage ditch to prevent Mallard Cove street flooding.
- Ravenna Road Culvert - Improved inlet for culvert and ditch cleaning outlet to prevent street flooding.
- City-wide Catch Basin Repair Program - Repaired deteriorating catch basins throughout the city.
- 10204 Ravenna Road / Waste Water Treatment Plant Driveway - Storm sewer upgrades planned for 2011 to eliminate flooding of Grace Lutheran Church property and Ravenna Road after heavy rain events.
- Enterprise Parkway - Storm water detention improvements project is in the conceptual planning / design stage to eliminate flooding issues for area commercial properties. Survey and easement work have begun on this project.
- Post Road - Storm and Sanitary Sewer installation project completed.
- Dutton Drive - Culvert replacement project completed.
- Edgewood Drive - Storm sewer installation project completed.
- Rolling Hills Drive and Timber Court - Drainage improvements project completed.
- Croyden and Haverhill Roads - Storm improvements completed as part of roadway project.
- Laurel Creek Restoration - Restored and enhanced approximately 3,000 linear feet of Laurel Creek and its adjacent uplands and wetlands. Located just west of Ravenna Road to Tinker's Creek.
- Dayflower Drive - Storm improvements project completed.
- Adams Park - Detention Basin Improvement Project completed.
- Glenwood Preserve - Stormwater Improvements Project - Phases 1 and 2 completed.